Showing posts with label thinking outside the site. Show all posts
Showing posts with label thinking outside the site. Show all posts

Friday, 7 December 2012

A Happy Accident

So, like I said in my last post, I spent Wednesday afternoon in my room building this site model. (Photos to go up later) I decided to use foam board in the end just for convenience but I could have used cardboard as well. I was originally going to make it to scale - using our site printouts but found that was far too small so I had to improvise and make a rough sketch slightly bigger than the site. I was going to make it completely stepped but realised that this would use a lot more foam board than I had and again improvised by making 6 large/wide 'steps' instead of several smaller ones. This actually worked out better due to the scale and the thickness of the foam board. My original idea was to make the steps from one side of the site going down to the other. I worked with this until I put one of the pieces in the wrong place. But it worked. Rather than having a straight line of steps down to the water, there is one step about half way down that  is slightly different and create a space that is a bit separate from the rest of the site. This space would be good for more private functions of the kayak centre and I am now looking at putting the meeting rooms on this part of the site.


The layout of the site reminds me of the ripples that the river made and I remember making a video of the currents in the river just up stream from the site. This connection to the river works well and I can use this idea to further develop my design. The river is, after all, key to the project and to Ironbridge. I know need to concentrate on relating my buildings to the site and therefore to the river. I am currently working on the site layout and how I can create enough height within my buildings.

Tuesday, 20 November 2012

Thinking Outside The Site

Apologies for the crude photo - on a bit of a roll at
the moment
After having to take a step back from my initial design and talking myself though ideas, I finally came up with a design that I think I can work with.
My biggest problem with the site is how narrow the site is. There is also quiet a steep terrain to it which makes it even more difficult. 
So, in order to maximise what little width I had, I had to think outside of the site. 
One of the key ideas for this project is vertical circulation. I haven't quite got a design for the staircase (Thinks back to A level project) and whether I want it as a prominent feature of the building or not, but I have an idea of how my building is to be laid out, taking into account the changing levels of the site.
Rather than having an entrance car park level and trying to get down to footpath (main site) level like my previous design, I have instead made the most of this second storey to create a central atrium space as my multi-purpose area. I have connected all of this first floor space with a walk way around the double height space which will be home to the race office, office and meeting spaces. Downstairs will be the main area and the facilities including toilets, kitchen and storage.

Obviously my design needs more than a little bit of refinement but felt I should update the blog/journal. Back to work and time to do some actual sequential drawings now!