Last week, I said no more AutoCAD . . . . . . I spent 12 hours on it yesterday and another good couple today. Not to mention the time early in the week.
But, I think I am almost done. I have now finished my plans and added all the details in the way of furniture etc. All that is left to do is make them look pretty in Photoshop. I have also made a lot of progress on my SketchUp model which means I will be able to start animating that for my video. That will probably be done tomorrow.
Tuesday saw us all back in studio and we had one on one tutorial. As I had more or less completed my tech drawings by then, I was able to get some feedback on them and how I could improve them. If I learnt anything on Tuesday, it was that circulation space is a waste of space. Yes, it is needed but it can be compressed in order to make the most of space and, essentially, save money. Don't put doors where they aren't needed either. So baring these points in mind, I rearranged the changing rooms and conference centre in order to create more space and to get rid of unnecessary circulation space. It was something that hadn't occurred to me but when mentioned, made a lot of sense.
As well as my video, the only thing I really need to finish and check of my list are the vertical circulation, the video and then getting everything in a presentable format.
Showing posts with label model. Show all posts
Showing posts with label model. Show all posts
Friday, 18 January 2013
Saturday, 22 December 2012
Vertical Circulation
This time I really have sorted my design out and to prove it, I even built it on SketchUp I sorted the scale of the buildings out and because they were smaller, I needed to adjust how I arranged the site. This was simply a case of levelling it out differently to fit in with the buildings. Once I had done this I then needed to work out the vertical circulation through the site. In my original concept, I wanted to create a stepped landscape in which to sit the buildings, this is to make the outside part of the centre and give it a function. I therefore wanted to split the purpose of the step into seating as well as for movement around the site. I want to make spaces that people can sit and watch the kayaking and any other events held at the centre.Using my SketchUp model, I was able to experiment with different forms and I was able to come up with a layout/design that worked well. The main staircase on the site runs along side the staircase within the building. This is to create the link between interior and exterior. It is also the only set of stairs on the site the doesn't follow the contours of the site. There are two types of steps in my design: the usual height/depth stairs and ones which are double in dimension These second type allow for visitors to site and watch any events. They all face towards the river as that is where my main point of focus is.
Within my design, I tried to keep the meeting rooms as separated as possible without putting a wall up around the building. I therefore have one staircase directed at that building.
Monday, 10 December 2012
Design: Check!
I started designing by using card to represent the buildings and placing them on site in various places. I then built it up and the model allowed me to see how the buildings would sit in the landscape and the views available from their positioning.
Space was still tight so I had to add extra floors to accommodate the office and race office.
The site is spilt by purpose with three buildings. Starting upstream, the first building on site are the meeting rooms. These are separate from the rest of the site to allow privacy for business meetings etc. As well as being out of the way, the rest of the site is hidden from them by the landscape and the main building. The views would be upstream and across the river, meaning that any activity happening downstream doesn't cause distraction.
Now that I have the design for my site, I am going to expand on it by carefully planning the interior and the vertical circulation within the main building. I am also going to start looking into materials. As the site has flooded severely in the past, and is therefore likely to do so again, I want to think about this carefully: concrete seems the best option but I don't feel like it would fit into its surroundings very well.
Friday, 7 December 2012
A Happy Accident
So, like I said in my last post, I spent Wednesday afternoon in my room building this site model. (Photos to go up later) I decided to use foam board in the end just for convenience but I could have used cardboard as well. I was originally going to make it to scale - using our site printouts but found that was far too small so I had to improvise and make a rough sketch slightly bigger than the site. I was going to make it completely stepped but realised that this would use a lot more foam board than I had and again improvised by making 6 large/wide 'steps' instead of several smaller ones. This actually worked out better due to the scale and the thickness of the foam board. My original idea was to make the steps from one side of the site going down to the other. I worked with this until I put one of the pieces in the wrong place. But it worked. Rather than having a straight line of steps down to the water, there is one step about half way down that is slightly different and create a space that is a bit separate from the rest of the site. This space would be good for more private functions of the kayak centre and I am now looking at putting the meeting rooms on this part of the site.
The layout of the site reminds me of the ripples that the river made and I remember making a video of the currents in the river just up stream from the site. This connection to the river works well and I can use this idea to further develop my design. The river is, after all, key to the project and to Ironbridge. I know need to concentrate on relating my buildings to the site and therefore to the river. I am currently working on the site layout and how I can create enough height within my buildings.
The layout of the site reminds me of the ripples that the river made and I remember making a video of the currents in the river just up stream from the site. This connection to the river works well and I can use this idea to further develop my design. The river is, after all, key to the project and to Ironbridge. I know need to concentrate on relating my buildings to the site and therefore to the river. I am currently working on the site layout and how I can create enough height within my buildings.
Subscribe to:
Posts (Atom)
