Last week, I said no more AutoCAD . . . . . . I spent 12 hours on it yesterday and another good couple today. Not to mention the time early in the week.
But, I think I am almost done. I have now finished my plans and added all the details in the way of furniture etc. All that is left to do is make them look pretty in Photoshop. I have also made a lot of progress on my SketchUp model which means I will be able to start animating that for my video. That will probably be done tomorrow.
Tuesday saw us all back in studio and we had one on one tutorial. As I had more or less completed my tech drawings by then, I was able to get some feedback on them and how I could improve them. If I learnt anything on Tuesday, it was that circulation space is a waste of space. Yes, it is needed but it can be compressed in order to make the most of space and, essentially, save money. Don't put doors where they aren't needed either. So baring these points in mind, I rearranged the changing rooms and conference centre in order to create more space and to get rid of unnecessary circulation space. It was something that hadn't occurred to me but when mentioned, made a lot of sense.
As well as my video, the only thing I really need to finish and check of my list are the vertical circulation, the video and then getting everything in a presentable format.
Showing posts with label development. Show all posts
Showing posts with label development. Show all posts
Friday, 18 January 2013
Monday, 10 December 2012
Design: Check!
I started designing by using card to represent the buildings and placing them on site in various places. I then built it up and the model allowed me to see how the buildings would sit in the landscape and the views available from their positioning.
Space was still tight so I had to add extra floors to accommodate the office and race office.
The site is spilt by purpose with three buildings. Starting upstream, the first building on site are the meeting rooms. These are separate from the rest of the site to allow privacy for business meetings etc. As well as being out of the way, the rest of the site is hidden from them by the landscape and the main building. The views would be upstream and across the river, meaning that any activity happening downstream doesn't cause distraction.
Now that I have the design for my site, I am going to expand on it by carefully planning the interior and the vertical circulation within the main building. I am also going to start looking into materials. As the site has flooded severely in the past, and is therefore likely to do so again, I want to think about this carefully: concrete seems the best option but I don't feel like it would fit into its surroundings very well.
Subscribe to:
Posts (Atom)